PROJECTS
Imperial Oil
Key Projects
• Sioux Lookout Cardlock Upgrade
• Pass Lake Retail Site Re-development
• Bow Island Terminal, AB
• Digby Terminal, NS
• Amherst Terminal, NS
• Fredericton Terminal, NB
• Gretna Terminal, NB
• Finch Terminal Man Machine Interface
• Finch Terminal Jet Fuel Clay Pack Upgrade
• Ottawa Terminal Man Machine Interface
• Ottawa Terminal Vapour Recovery Design Specification
• Belleville Terminal Vapoour Recovery Design Specification
• Esso Chemical Facility Design Specification
• Sarnia Terminal Vapour Recovery Design Specification
• St. George Terminal Pipeline Manifold Valves Automation
• Nanticoke Refinery Access Platforms in Steam Plant
• Winnipeg BioDiesel Project
• Edmonton Ethanol Design Basis
• Belleville Ethanol E10 Project
• Winnipeg Ethanol E10 Project
• Ottawa Ethanol E10 Project
• Regina Ethanol E10 Project
• Winnipeg Rail Offloading Project
• Winnipeg Jet Filtration Design Basis
• Finch Terminal Ethanol E10 Project
• Ontario Ultra Low Sulphur Diesel conversion Program
• Sault Ste. Marie Pipleline Upgrade

Imperial Oil |
| |
| |
| The story began in 1880, when 16 refiners in southwestern Ontario created The Imperial Oil Company, Limited. |